Construction Team:
Neil Bell, Project Superintendent
Penhold Bridge Carrying Hwy. 592:02 over Red Deer River
The Penhold Bridge project consisted of major rehabilitation of BF 2431 carrying Highway 592:02 over the Red Deer River.
The work consisted of installation of under slung diaphragms, lateral post tensioning, partial depth and full depth deck repair, deck joint replacement, refurbishing bridge rail, approach guardrail installation and deck concrete overlay
The labour intensive nature of the work slowed progress somewhat however all time schedules were met and the Client was pleased with the results thanks to Neil Bell and his crew.