Client:
M.D. of Wood Buffalo

Contract Value:
$780,000

Contract Schedule:
July 4 to August 20, 2007

Construction Team:
Contract Manager: David Scragg, Project Manager: Elvin Yanish

M.D. of Wood Buffalo

Thickwood Heights Water Supply
The MD of Wood Buffalo required that a watermain be constructed into the new residential areas of Thickwood and Confederation near Fort McMurray and that it be built in four phases. Carmacks was awarded the final and most difficult phase of the 24” water supply.

The complexity of this project was at the tie-in of the existing meter valve. This was a jigsaw puzzle of communication cables including Shaw and Telus; a duct bank; water lines along with three sets of high voltage cables. In order to complete the work, the high voltage power cables supplying power to the Thickwood area were de-energized for 6 to 8 hours. When this occurred, the crew had to be ready to do their installations and tie-ins in as short a time as possible. They had to make sure they had all supplies and the abilities to accommodate any unforeseen situation.

The entire project was completed on time and within budget.
Download PDF.
contact us | back to top    

WORK WITH CARMACKS!

Equal Opportunity Employer

Excellent wage and benefit package

Benefit coverage with Merit Contractors

Group RRSP Program

Student Partnering Program

Active Safety Program

Employee Recognition Programs

Read More...